DRAWINGS
Every drawing, revision and snag in one place
Upload a whole set, keep revision codes that follow the ISO 19650 convention, and issue them with acknowledgement. Mark up and comment on the drawing, and drop pins that raise snags and issues linked to the exact spot.
Raised from the drawing, linked to the item
Riverside · Drawings
C02RVS-HDA-ZZ-01-DR-A-0101Level 01 GA plan
100%Page 1 of 1
CompareMeasureMark up
ViewMark upItems 56Snag 014: Fire stopping missing at riserSnag list · Level 01
OpenAPAlex PriceDue 14 Nov
Items 56Comments 012
Colour by: StatusLayers
Snag 014: Fire stopping missing at riserOpenAlex Price
Snag 011: Ceiling tile damaged in office 01OpenSam Taylor
Snag 012: Skirting not fixed in kitchenIn progressJo Malik
Snag 009: Paint touch-up in meeting roomClosedSam Taylor
Issue 006: Door closer missing to WCIn progressAlex Price
Snag 007: Socket faceplate crackedClosedJo Malik
On cloud mark-up · Riser 2
JM
Jo Malik just now@Alex Price can we get the fire stopping detail for this riser?
AP
Alex Price just nowRevised detail coming on C03 this week.
Reply or @mention someone
Snag 014: Fire stopping missing at riserOpenAlex Price · Due 14 Nov
OpenIn progressClosedCloud mark-upCommentC02Current revision
Trusted by contractors and teams across the UK














THE PROBLEM
Drawings shouldn't live in email and old folders
When drawings are scattered, people work from the wrong revision and the record of what was issued disappears.
Which revision is current?
Nobody’s sure which revision is current, so people work from whatever drawing they have to hand.
Issued by email, then lost
Revisions go out by email with no record of who has opened or acknowledged them.
Mark-ups as screenshots
Mark-ups end up as screenshots in chats and inboxes, and nobody can find them later.
Snags without a location
Snags are raised away from the drawing, so the exact location gets lost.
FEATURES
Everything you need to manage drawings
From the first upload to the last snag, every drawing, every revision and all the work raised against it sit on the project.
Bulk upload a whole set
Drag in 100 files or more, then upload revised sets the same way, matched by drawing number.
ISO 19650 revision codes
P01, P02, C01: revision codes follow the ISO 19650 convention and are always ordered correctly.
Compare any two revisions
Overlay an earlier revision on the current one, or view them side by side, to see what moved.
Mark up and measure
Clouds, arrows, text and measurements on a layer that never changes the drawing file.
Pins that raise items
Drop a pin to raise a snag, issue, RFI or any item, with the drawing and position filled in.
A dated drawing register
One row per drawing, one column per issue. Export to Excel, CSV or a PDF issue sheet.
Transmittals with acknowledgement
Issue drawings to chosen people and see who has opened and acknowledged them.
Works offline on site
Mark up and raise items with no signal, then sync later. Share any drawing by QR code.
BULK UPLOAD
Get the whole set in
Drag in a full drawing set, 100 files or more, and check it before anything is saved.
Drawing number, title and revision pre-filled from the PDF or filename
Set the discipline for many rows at once, and add matches as new revisions
A failed file never fails the batch: retry it on its own
REVISIONS
Revisions you can trust
Revision codes follow the ISO 19650 convention: P for preliminary, C for contractual, then a two-digit number.
C01 is newer than P07, so the current revision is always right
Only the current revision opens as the working drawing
Download or compare any earlier revision from the version history
DRAWING COMPARISON
See exactly what changed
Compare any earlier revision with the current one. Switch between overlay and side by side to see what moved.


Compare any earlier revisionDifferences in two coloursOverlay or side by sideNobody works from an old drawing
MARK-UPS
Mark up the drawing
Cloud an area as you raise a snag, or mark up the drawing itself for the whole team.
Item mark-ups stay with their item, and drawing mark-ups need no item
Link an area to its detail drawing, always at the current revision
A separate layer: the file never changes, and who and when is recorded
COMMENTS
Comment on the drawing
Talk about the exact spot on the drawing, not a screenshot of it.
Comment on a point, a pin or a mark-up, and reply in threads
@mention people and they get a notification
Select a comment to jump to its place on the drawing
PINS
Drop a pin, raise the work
Every pin raises or belongs to an item: a snag, an issue, an RFI or any of your project’s tools.
The item opens with the drawing and position already filled in
Tap a pin to see its title, status, assignee and photo
Colour pins by status or list, or pick from 12 colours
LINKED ITEMS
Linked to every item
Pins work both ways, so the drawing and the item always point to each other.
An item’s page lists every drawing it’s pinned to
Thumbnails are cropped to the pin and its mark-ups
Item reports show the drawing with its pins and mark-ups
DRAWING REGISTER
The drawing register, kept for you
The drawing issue sheet you keep in Excel today, built from every issue you publish.
One row per drawing and one column per dated issue
Export to Excel, CSV or a PDF issue sheet with your logo
Issue columns are locked, and every amendment is logged
TRANSMITTALS
Issue it and know who's seen it
Send drawings to chosen people as a transmittal and see who has acknowledged them.
One acknowledgement per transmittal, however many drawings it holds
Recipients are prompted until they acknowledge
A transmittal log shows what was issued, to whom and when
ON SITE
On site, signal or not
The same viewer on a phone, built for one-handed use on site.
Drawings open offline, and pins, items and mark-ups sync later
Print a drawing’s QR code for the site
People without an account join the project as read-only
Get your drawings into Insite
Book a demo and we’ll show you how to upload a set, issue it and raise work from it.
HOW IT WORKS
From upload to site in four steps
Get the set in, issue it, and let the team work from the current revision.
1
Upload your drawing set
Drag in the whole set and check numbers, titles and revisions before anything is saved.
2
Check it and publish an issue
Admins review pending drawings and publish them as a dated issue in the drawing register.
3
Send it out as a transmittal
Issue the drawings to chosen people and see who has acknowledged them.
4
Mark up and raise items on site
Teams open the current revision, mark it up and drop pins that raise snags and issues.
WHO IT'S FOR
Built for the whole team
Everyone on the project sees the drawings they should, at the current revision.
Document controllers and project managers
Get the set in, keep it current and issue it, with a dated drawing register and a transmittal log.
Site managers
Mark up, measure and raise items from the drawing on a phone, with or without signal.
Sub-contractors
See the drawings shared with you, always at the published current revision.
Clients and read-only users
Open the current revision of every drawing shared with you, and read threads you’re mentioned in.
Looking for specs, reports and other project files? See Documents
Frequently asked questions
How do I upload a full drawing set?
Drag in the whole set, 100 files or more, and uploads run in the background with progress for each file. A review step lets you check the drawing number, title, ISO 19650 revision code and discipline before anything is saved.
Can I compare drawing revisions?
Yes. Compare any earlier revision with the current one, overlaid or side by side, to see exactly what moved.
Can I raise snags and issues from a drawing?
Yes. Drop a pin to raise a snag, issue, RFI or any item from your project's tools, with the drawing and position already filled in.
Can I issue drawings and see who has acknowledged them?
Yes. Send drawings as a transmittal and see who it was delivered to, who has opened it and who has acknowledged it. Each transmittal needs one acknowledgement, however many drawings it holds.
Do drawings work offline on site?
Yes. Opening a drawing saves it for offline use, and you can place pins, raise items, mark up and add photos with no signal. Everything syncs when you're back online.
What file types can I upload, including CAD?
PDF, PNG and JPG, including multi-page PDFs. DWG, DXF, DGN and DWF files are converted so they open in the viewer with no CAD licence.
Which plans include Drawings?
Drawings are included on the Premium and Premium Plus plans. See pricing or talk to us to find the right plan for your team.
SAVINGS CALCULATOR
See what Insite could save you
Work out the time your team could get back with Insite in under a minute.