About the client
MPACT Group is a construction, refurbishment and fit-out contractor working mainly in Scotland and across the UK. It delivers capital projects for private clients and for public sector frameworks.
The challenge
Paper site files, email chains and hours of report admin
- MPACT Group ran its projects on email, paper site files and manual documents.
- Snagging was slow. Teams photographed issues on site, went back to the office, copied the photos into spreadsheets, resized them and formatted everything before a report could go out.
- With several project managers working for different clients, documents varied in style and presentation, so it was hard to keep one standard across the business.
- Site sign-in, inductions and RAMS briefings were all recorded on paper.
Keep the full story to hand
The MPACT Group case study as a 4-page PDF, ready to share with your team.
The solution
One live system that works for site teams
- As the business looked to modernise, Sean and the team went to market for a digital system that would work for site teams, and chose Insite in March 2025.
- Everything is captured on site, in real time. Teams raise RFIs, submit technical documents, complete forms and inspections and log snags straight from site.
- RFIs, submittals, change requests and snag lists run through one system that site teams, design teams and clients see at the same time.
- Supply chain, operatives and client teams join as free external users. Digital inductions followed in January 2026, and site sign-in and timesheets in February 2026.
“
Insite has improved our systems and processes and brought us up to a new standard, away from traditional paper-based processes, and keeping with the times.
Sean Coleman
Operations Manager, MPACT Group
Share MPACT Group's story with your team
About Sean
Sean Coleman
Operations Manager, MPACT Group
Sean is Operations Manager at MPACT Group, responsible for project delivery, operations and the management systems and processes used across the business. He led MPACT’s move from paper and email to Insite.
The results
2,597 hours of admin taken off MPACT's sites
2,597
admin hours saved to date
23,517
A4 sheets no longer printed
6.9×
return on annual investment
Figures: Insite platform data from 28 Aug 2025 to 8 Oct 2026. Admin time valued at £35 per hour.
- 10,454 site sign-ins, 7,426 forms and inspections and 2,570 RAMS sign-offs captured digitally instead of on paper.
- 1,508 reports generated and 6,533 snag and item updates moved on through Insite.
- About 23,517 A4 sheets of paper no longer printed, filed or archived.