Meet Pulse, your AI construction assistant Explore

Main Contractors

One standard across every site, every subcontractor

Insite puts quality, progress, safety and commercial records on one system, so every project on your books reports the same way and nothing depends on who remembered to fill the spreadsheet in.

Live on iOS, Android and web · Works offline on site

Main contractor site team on a tower crane project, with Insite showing a 94 percent first time pass rate across 12 live projects
Trusted by main contractors across the UK
The reality

Fifteen sites, fifteen different ways of working

The information exists. It is just sitting in someone else’s inbox, spreadsheet or camera roll.

Every site reports differently

Each project manager built their own tracker, so no two progress reports can be put side by side.

The record leaves when the person does

Photos, snag lists and sign-offs sit on individual phones and laptops, not against the job.

Subcontractors mark their own homework

Quality evidence arrives late, in whatever format the package supplier felt like sending.

Handover starts three weeks late

The pack gets reconstructed from memory and chased by email instead of assembled as the job was built.

62%

fewer defects reaching the client inspection

3 wks

earlier handover packs, ready on completion

96%

of inspections closed out within 48 hours

Quality

Your inspection standard, on every site

Your ITPs and check sheets digitised once and issued to every project, so the same standard applies whether the job is in Leeds or Southampton.

Your own templates, not generic forms
Same standard on every project
Updates deploy to every site instantly
Two site managers checking an Insite ITP for a level 3 pour on a tablet at the work face
Insite drawing comparison highlighting three changes between revision B and revision C of a level 3 layout, with a snag pinned to the drylining package
Snagging

Snags assigned to the subcontractor who owns them

Mark the defect on the drawing, photograph it and assign it before you have walked to the next room.

Pinned to plot, level and drawing
Assigned to the responsible package
Closed out with photographic evidence
RFIs and technical submittals

RFIs that do not stall the programme

Every query logged, dated and visible, so the design team’s response time is a fact rather than an argument.

Raised from site with photos attached
Response times visible to everyone
Nothing lost in an email chain
Site engineers on a call, with an Insite RFI answered in two days and referenced to the drawing
Insite variations tracker listing instructed changes evidenced on site and ready to export for the valuation
Variations

Variations captured the day they happen

Instructed change recorded on site with evidence, so the commercial conversation starts from a record instead of a recollection.

Logged at the point of instruction
Photo and comment attached
Exportable for the valuation
Progress

Progress reported from site, not rebuilt on a Friday

Site diaries, photos and progress captured as the work happens and rolled up into one report across every project.

Captured daily on the phone
Consistent across every project
Client-ready without retyping
Site manager recording progress on site, with an Insite weekly report rolled up across twelve sites
Insite compliance register showing a permit to work, lifting plan certificate and tower crane pre-start check signed off with names and timestamps
Compliance

Evidence that stands up to an audit

Permits, certificates and pre-start checks filed against the job the moment they are completed, with names and timestamps.

Named and time-stamped records
Nothing filed after the event
Ready before the auditor asks
Handover

Handover packs assembled as you build

Every inspection, photo and certificate already filed against the plot, so the pack is assembled rather than reconstructed.

Built from records captured on site
Client-ready PDF per plot or phase
Outstanding items visible before completion
Insite handover pack for phase 2 showing 412 signed inspections, certificates filed per plot and two outstanding items
One system

Four products, one record

Everything your sites capture lands in the same place, so the answer is never in a different system.

Pulse AI

Ask what changed across every live project and get an answer, not a spreadsheet.

Workforce Management

See who is on which site, what they are certified for and when it expires.

Form Builder

Build the form your contract demands and push it to every subcontractor at once.

Documents & Drawings

Latest drawing revision in every pocket, marked up where the issue is.

By role

Everyone on the job gets their Friday back

The same record, read five different ways, so nobody rebuilds someone else’s spreadsheet.

Contracts Manager

Compare fifteen sites on the same measure.

One reporting standard across the portfolio
Problem projects visible early

Project Manager

Stop chasing the record and start reading it.

Live view of quality, progress and snags
RFIs and variations in one place

Site Manager

Capture it once, at the work face.

Works offline in the basement
Diary and inspections in minutes, not evenings

Quantity Surveyor

Value change from evidence, not recollection.

Variations logged the day they happen
Photo and date behind every claim

H&S Manager

Prove the safety regime, not just describe it.

Inspections, toolbox talks and incidents logged
Audit-ready evidence per site
A day on site

The record builds itself through the day

1
07:15 · Start of shift

Checks signed before the first lift

Pre-start checks and permits signed off on the phone before the first lift.

2
10:30 · During the works

Inspections at the work face

Inspections completed at the work face, snags pinned and assigned as they are found.

3
15:00 · Queries and change

RFIs and variations from site

RFIs and variations raised from site with photos, dated and visible to the office.

4
16:45 · End of day

The client report is already done

Diary and progress photos submitted, and the client report is already up to date.

“Utilising Insite has led to a marked reduction in defects post-completion, translating to substantial time and cost savings each month.”

Nathalie Addington-Smart · Aftersales Manager, Lindum Group

Two site managers walking a completed floor with an Insite report on a tablet, with post-completion defects trending down
Works offline on site
Live in days, not months
Training fits one toolbox talk
Your templates, not generic forms

Build the record as you build the job

Your templates, configured for you
Training that takes one toolbox talk
Live on site in days, not months
Main contractor portfolio view in Insite, with quality, progress and compliance reporting rolled up across every live project

Frequently asked questions

What is construction software for main contractors?
It is one system for the site records a main contractor has to keep: quality inspections, snagging, progress, health and safety, compliance and commercial change. Insite captures each of those on a phone at the work face and holds them against the project, so every site on your books reports the same way and the record is complete without chasing.
Can we use the same inspection standard on every project?
Yes. Your ITPs and check sheets are digitised once and issued to every project, so a site in Leeds and a site in Southampton are measured the same way. Updating a template pushes the change to every live site immediately.
How do we get quality evidence out of our subcontractors?
Subcontractors complete your forms on their own phones, with photos attached to each line and a timestamp on submission. The record lands against your project rather than arriving as a PDF by email weeks later, and snags are assigned to the responsible package and closed out with photographic evidence.
Does Insite handle RFIs and technical submittals?
Yes. RFIs and technical submittals are logged from site with photos attached, dated, assigned and tracked to a response, so delay is evidenced rather than argued about.
Can we track variations for the valuation?
Yes. Instructed change is recorded on site the day it happens with a photo, comment, date and name, then exported for the valuation. That turns a commercial conversation into a records conversation.
How does reporting work across multiple projects?
Because every project uses the same templates, progress, quality and safety data roll up across the portfolio. You can compare first time pass rates by project, trade and subcontractor, and see which sites are drifting while it can still be changed.
Does it work with no signal?
Yes. Everything is captured offline, including photos and signatures, and syncs as soon as the device is back in range. Basements, lift shafts and rural sites are the normal case, not the exception.
How long does it take to roll out across our sites?
Days rather than months. Your templates are configured for you, the app runs on iOS, Android and web, and site training fits into a single toolbox talk. Most contractors run one project as a pilot and then roll out across the portfolio.