Case study · Underfloor heating

How Polypipe Building Products avoids costly rework with every underfloor heating install recorded before the screed

Polypipe uses Insite to check that underfloor heating is installed to its design and evidenced before the screed goes down. 1,708 plots across 19 developments are now on live QA, and the same setup has since been rolled out to Polypipe’s compliance team.
Free 4-page PDF
Plot check card showing the pipe layout matches the design, photos added and approved before screed
UFH checks before screed
Service
Water management and underfloor heating systems
Offices
Doncaster, South Yorkshire
Insite modules used
QA & inspections
Reports
Docs & drawings
Pulse AI
Key outcomes

Checked before the screed

Installers evidence each underfloor heating install with photos while the pipework is still visible.

One place to approve

Polypipe’s technical team reviews every check flagged complete from a single view.

Live install data

Knowing when installs happen helps Polypipe predict which products will be needed.
Curious what Insite could give back to your team?
Try our cost saving calculator
About the client
Polypipe Building Products is the UK’s leading manufacturer of plastic piping systems and low-carbon heating solutions in the residential market. Part of the Genuit Group plc, they design, develop and manufacture over 4,000 product lines. Dean Asher leads technical sales, with a focus on growing underfloor heating and low-temperature heating solutions.
The challenge

Good designs on paper, but no view of how they were installed

  • Underfloor heating is a design-led product, but Polypipe Building Products had no reliable way to know installers were following the design on site.
  • Evidence arrived now and then, usually as a single photo asking “is this correct?”, and often after the floor had already been screeded.
  • Once 75mm of screed is poured, a check is too late to be useful.
  • Designers in the office had little practical install knowledge, so some designs stayed theoretical.
Diagram of the gap between an underfloor heating design, the install on site and the screed being poured before any check
Diagram of the gap between an underfloor heating design, the install on site and the screed being poured before any check
Cover of the Polypipe case study PDF
Keep the full story to hand
The Polypipe case study as a 4-page PDF, ready to share with your team.
The solution

A simple, visual QA check on every plot, before the screed

  • Polypipe’s Insite plan opened in September 2025. The underfloor heating QA programme was set up in February 2026, and the first installer check was completed on site in April 2026.
  • Installers evidence each install from their phone. The check was designed with Insite to be visual, with a few simple tick boxes and photos, because busy installers don’t want to fill in lots of forms.
  • Plots are imported per development and UFH layouts are issued to site teams in Insite. When an installer completes a check, it appears in a “To approve” list for Polypipe’s technical team to review.
  • The programme worked so well that Polypipe rolled Insite out to its compliance team in August 2026, who audit sites to make sure specified products are the ones being fitted.
Four-step flow: design issued to site, pipe laid on the grid, photo check from the phone and approval by the technical team before the screed
Four-step flow: design issued to site, pipe laid on the grid, photo check from the phone and approval by the technical team before the screed
“
The support has been outstanding from day one. From the initial scoping through to implementation and the support afterwards, it’s the best I’ve had from any software provider. I see Insite more as a partner than a supplier.
Dean Asher
Head of Technical Sales and Underfloor Heating
Share Polypipe's story with your team
About Dean

Dean Asher

Head of Technical Sales and Underfloor Heating, Polypipe Building Products
Dean leads Polypipe’s underfloor heating strategy. With more than two decades in heating, he is a former Chair of the BEAMA UFH Group and a recognised voice on underfloor heating design and low-temperature systems.
The results

1,708 plots on live QA, checked before the screed

1,708
plots on live QA across 19 developments
329
installs checked remotely with photo evidence
5,555
A4 sheets no longer printed or filed
Figures: Insite platform data from 19 February 2026 to 26 October 2026.
  • Installers request a check while the pipework is still visible, so Polypipe’s technical team can approve an install before the screed, without a trip to site.
  • Every plot’s QA evidence is held digitally, ready to call up long after the floor is finished.
  • Live data on when installs are happening helps Polypipe predict which products will be needed, and when.
How Insite helped

What changed for Polypipe's design and technical teams

01

A QA record for every plot

Each plot has its own QA record, and installers request a check with photo evidence while the pipework is still visible.
Grid of plots with their QA status, with one plot's QA record open showing a check requested with photos
Grid of plots with their QA status, with one plot's QA record open showing a check requested with photos
02

One place to approve checks

The technical team reviews, approves or rejects each install from a single “To approve” view, then moves the plot on.
To approve queue of underfloor heating install checks with approve and reject buttons
To approve queue of underfloor heating install checks with approve and reject buttons
03

Designs that travel to site

UFH layouts and documents are issued straight to installers’ phones, and what comes back is helping office designers make their designs more practical.
Underfloor heating layout issued from the office to a phone on site, with site feedback going back to the designer
Underfloor heating layout issued from the office to a phone on site, with site feedback going back to the designer
04

Answers without digging

Pulse AI answers questions such as how many plots have been checked, without anyone having to dig through individual projects.
Pulse AI chat answering how many plots are on live QA
Pulse AI chat answering how many plots are on live QA
Free PDF

Get the full Polypipe case study

Four pages on how Polypipe checks underfloor heating installs before the screed, with the challenge, the rollout and the results.
Cover of the Polypipe case study PDF